Locating the Chutes
Use the following procedures to locate the starting position of the first chute.
1. Starting from the top hole in the first sidewall sheet (55), measure down the “starting distance” (51)
for the location of the first chute.
2. Keep adding the required number of chutes, making sure to leave 8" between the chute bolt holes
(56).
Figure 9-17
Locating the chutes
51
Starting dimension for first chute
56
Distance between chute bolt holes
55
First hole on the top sheet
Table 9-3
Sidedraw chute installation
Number of rings
Starting dimension
Number of chutes
Horizontal location for first chute
11
62"
7
Middle of Sheet
12
42"
9
Middle of Sheet
13
54"
10
Middle of Sheet
14
34"
12
Center between Stiffeners
15
46"
13
Center between Stiffeners
16
58"
14
Center between Stiffeners
17
38"
16
Center between Stiffeners
18
50"
17
Center between Stiffeners
19
62"
18
Center between Stiffeners
20
42"
20
Center between Stiffeners
21
54"
21
Center between Stiffeners
22
34"
23
Center between Stiffeners
23
46"
24
Center between Stiffeners
24
59"
25
Center between Stiffeners
25
40"
27
Center between Stiffeners
26
52"
28
Center between Stiffeners
27
32"
30
Center between Stiffeners
28
44"
31
Center between Stiffeners
29
56"
32
Center between Stiffeners
30
36"
34
Center between Stiffeners
212
PNEG-5490D-2X
90' Diameter EVO-50 Beam 2X Bin
Summary of Contents for EVO-50
Page 6: ...NOTES 6 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 34: ...NOTES 34 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 130: ...NOTES 130 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 188: ...NOTES 188 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 220: ...NOTES 220 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...