3-8
C60 Breaker Protection System
GE Multilin
3.1 DESCRIPTION
3 HARDWARE
3
The torque used to connect the terminal blocks to the back of the relay chassis (screws a, b, c shown) is 9 inch-pounds. For
the connections to the terminal blocks (rows 1 to 8), use a minimum of 17 inch-pounds. During manufacturing, the power
supply and CPU modules are installed in slots B and D of the chassis with 13 inch-pounds of torque on the screws at the
top and bottom of the modules.
Summary of Contents for C60
Page 10: ...x C60 Breaker Protection System GE Multilin TABLE OF CONTENTS ...
Page 30: ...1 20 C60 Breaker Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Page 420: ...5 284 C60 Breaker Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 466: ...8 4 C60 Breaker Protection System GE Multilin 8 1 FAULT LOCATOR 8 THEORY OF OPERATION 8 ...
Page 478: ...9 12 C60 Breaker Protection System GE Multilin 9 6 DISPOSAL 9 MAINTENANCE 9 ...
Page 492: ...A 14 C60 Breaker Protection System GE Multilin A 1 PARAMETER LISTS APPENDIX A A ...
Page 648: ...E 10 C60 Breaker Protection System GE Multilin E 1 OVERVIEW APPENDIX E E ...
Page 660: ...F 12 C60 Breaker Protection System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...
Page 670: ...H 8 C60 Breaker Protection System GE Multilin H 2 ABBREVIATIONS APPENDIX H H Z Impedance Zone ...
Page 672: ...H 10 C60 Breaker Protection System GE Multilin H 3 WARRANTY APPENDIX H H ...
Page 682: ...x C60 Breaker Protection System GE Multilin INDEX ...