E-8
C60 Breaker Protection System
GE Multilin
E.1 OVERVIEW
APPENDIX E
E
Counter freeze with reset
Counter reset
General request counter
Request counter group 1
Request counter group 2
Request counter group 3
Request counter group 4
Parameter loading:
Threshold value
Smoothing factor
Low limit for transmission of measured values
High limit for transmission of measured values
Parameter activation:
Activation/deactivation of persistent cyclic or periodic transmission of the addressed object
Test procedure:
Test procedure
File transfer:
File transfer in monitor direction:
Transparent file
Transmission of disturbance data of protection equipment
Transmission of sequences of events
Transmission of sequences of recorded analog values
File transfer in control direction:
Transparent file
Background scan:
Background scan
Acquisition of transmission delay:
Acquisition of transmission delay
Definition of time outs:
Maximum range of values for all time outs: 1 to 255 s, accuracy 1 s
Maximum number of outstanding I-format APDUs
k
and latest acknowledge APDUs (
w
):
PARAMETER
DEFAULT
VALUE
REMARKS
SELECTED
VALUE
t
0
30 s
Timeout of connection establishment
120 s
t
1
15 s
Timeout of send or test APDUs
15 s
t
2
10 s
Timeout for acknowledgements in case of no data messages
t
2
<
t
1
10 s
t
3
20 s
Timeout for sending test frames in case of a long idle state
20 s
PARAMETER
DEFAULT
VALUE
REMARKS
SELECTED
VALUE
k
12 APDUs
Maximum difference receive sequence number to send state variable
12 APDUs
w
8 APDUs
Latest acknowledge after receiving
w
I-format APDUs
8 APDUs
Summary of Contents for C60
Page 10: ...x C60 Breaker Protection System GE Multilin TABLE OF CONTENTS ...
Page 30: ...1 20 C60 Breaker Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Page 420: ...5 284 C60 Breaker Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 466: ...8 4 C60 Breaker Protection System GE Multilin 8 1 FAULT LOCATOR 8 THEORY OF OPERATION 8 ...
Page 478: ...9 12 C60 Breaker Protection System GE Multilin 9 6 DISPOSAL 9 MAINTENANCE 9 ...
Page 492: ...A 14 C60 Breaker Protection System GE Multilin A 1 PARAMETER LISTS APPENDIX A A ...
Page 648: ...E 10 C60 Breaker Protection System GE Multilin E 1 OVERVIEW APPENDIX E E ...
Page 660: ...F 12 C60 Breaker Protection System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...
Page 670: ...H 8 C60 Breaker Protection System GE Multilin H 2 ABBREVIATIONS APPENDIX H H Z Impedance Zone ...
Page 672: ...H 10 C60 Breaker Protection System GE Multilin H 3 WARRANTY APPENDIX H H ...
Page 682: ...x C60 Breaker Protection System GE Multilin INDEX ...