Installation Procedure
GBC FusionPunch II Service Manual
12/2003
8-23
4.
Remove and replace the Document Transport Timing Belt, the Take Up Assembly, and the 2 Main Drive Pulleys. (Figure 8-21)
4.1 Remove the Take Up Assy. to loosen the Document Transport Timing Belt and remove both the Belt and the Take Up Assy.
4.2 Remove the 2 Main Drive Pulleys, by loosening both Set Screws on each Pulley.
4.3 Install the 2 new Drive Pulleys (7610532) from the Kit.
4.4 Install the new Document Transport Timing Belt (7610533) and mount the new Take Up Assy. (7610537) using the hardware from the original
Take Up Assy. Refer to section 4 of the FP II Service Manual for Belt Tension adjustments, if needed.
Figure 1-86 Replacing the Document Transport Main Drive Assy.
Take Up Assy.
Document Transport Timing Belt
Main Drive Pulleys
Summary of Contents for FusionPunch II
Page 10: ...GBC FusionPunch II Service Manual GBC Training Process 12 2003 1 6 Notes ...
Page 24: ...GBC FusionPunch II Service Manual Final Actions 12 2003 1 20 Notes ...
Page 80: ...GBC FusionPunch II Service Manual RAP 6 2 Printer Connectivity 12 2003 2 56 Notes ...
Page 324: ...GBC FusionPunch II Service Manual Host Machine Enablement DocuColor 6060 12 2003 6 52 ...
Page 332: ...GBC FusionPunch II Service Manual Notes 12 2003 6 60 Notes ...
Page 354: ...GBC FusionPunch II Service Manual Principles of Operation 12 2003 6 82 Notes ...
Page 364: ...GBC FusionPunch II Service Manual Tag Numbers 12 2003 6 92 ...
Page 402: ...GBC FusionPunch II Service Manual Component Locators 12 2003 7 38 Notes ...
Page 414: ...GBC FusionPunch II Service Manual Preparing to Install a Bypass Kit 12 2003 8 12 Notes ...
Page 430: ...GBC FusionPunch II Service Manual Notes 12 2003 8 28 Notes ...