GBC FusionPunch II Service Manual
REP 4.9 Document Transport Motor
12/2003
4-16
REP 4.9 Document Transport
Motor
Parts List: 1.1 B
WARNING
Switch off the Main Power.
Disconnect the power cord.
Removal
1.
Remove the Punch Rear Panels.
2.
Loosen the Allen Head Cap screw on the
Document Transport Timing Belt Take Up
Assembly.
3.
Remove the Document Transport Timing
Belt.
4.
Remove the 2 screws holding the shielding
plate over the cable connectors for the
Document Transport Motor Cable
Assembly.
5.
Record the location of the wires and then
remove the connectors from the Document
Transport Motor.
6.
Remove the 4 Carriage screws, the 4 Hex
Nuts and the 8 Washers holding the
Document Transport Motor.
7.
Remove the Punch Motor Pulley from the
old Punch Motor and install it on the new
Punch Motor.
Replacement
1.
Reinstall the parts in reverse order.
2.
Perform ADJ 4.1 Document Transport
Timing Belt Tension before turning on the
machine.
NOTE: Make sure that the Document Transport Motor Cable Assembly is being installed
as recorded in Step 5 in the removal procedure.
Figure 1.
Summary of Contents for FusionPunch II
Page 10: ...GBC FusionPunch II Service Manual GBC Training Process 12 2003 1 6 Notes ...
Page 24: ...GBC FusionPunch II Service Manual Final Actions 12 2003 1 20 Notes ...
Page 80: ...GBC FusionPunch II Service Manual RAP 6 2 Printer Connectivity 12 2003 2 56 Notes ...
Page 324: ...GBC FusionPunch II Service Manual Host Machine Enablement DocuColor 6060 12 2003 6 52 ...
Page 332: ...GBC FusionPunch II Service Manual Notes 12 2003 6 60 Notes ...
Page 354: ...GBC FusionPunch II Service Manual Principles of Operation 12 2003 6 82 Notes ...
Page 364: ...GBC FusionPunch II Service Manual Tag Numbers 12 2003 6 92 ...
Page 402: ...GBC FusionPunch II Service Manual Component Locators 12 2003 7 38 Notes ...
Page 414: ...GBC FusionPunch II Service Manual Preparing to Install a Bypass Kit 12 2003 8 12 Notes ...
Page 430: ...GBC FusionPunch II Service Manual Notes 12 2003 8 28 Notes ...