Installation Procedure
GBC FusionPunch II Service Manual
12/2003
8-27
9.
Remove the Stacker Bypass Assy. perform REP 5.2 (Bypass Assy. Removal) in the GBC FP II Service Manual.
10. Remove and replace the Bypass Stacker Main Drive Pulley with the new Pulley (7610535) from the Kit.
11. Replace the Stacker Bypass Assy., the Stacker Bypass Timing Belt, tighten the Stacker Bypass Motor, and install the Stacker Bypass Pulley
Covers.
12. Connect the main Power Cord to the Punch Unit and Power the Punch ON.
13. Go to the Control Panel and enter the Service Diagnostics.
14. Keep pressing the Diagnostics button until you get the Printer Select Function and the use the arrows to scroll to desired printer to be connected to.
15. Exit the Service Diagnostics.
16. Follow the normal installation procedure to complete the installation and training.
Summary of Contents for FusionPunch II
Page 10: ...GBC FusionPunch II Service Manual GBC Training Process 12 2003 1 6 Notes ...
Page 24: ...GBC FusionPunch II Service Manual Final Actions 12 2003 1 20 Notes ...
Page 80: ...GBC FusionPunch II Service Manual RAP 6 2 Printer Connectivity 12 2003 2 56 Notes ...
Page 324: ...GBC FusionPunch II Service Manual Host Machine Enablement DocuColor 6060 12 2003 6 52 ...
Page 332: ...GBC FusionPunch II Service Manual Notes 12 2003 6 60 Notes ...
Page 354: ...GBC FusionPunch II Service Manual Principles of Operation 12 2003 6 82 Notes ...
Page 364: ...GBC FusionPunch II Service Manual Tag Numbers 12 2003 6 92 ...
Page 402: ...GBC FusionPunch II Service Manual Component Locators 12 2003 7 38 Notes ...
Page 414: ...GBC FusionPunch II Service Manual Preparing to Install a Bypass Kit 12 2003 8 12 Notes ...
Page 430: ...GBC FusionPunch II Service Manual Notes 12 2003 8 28 Notes ...