GBC FusionPunch II Service Manual
ADJ 5.1 Stacker O-Ring Roller Assembly
12/2003
4-32
ADJ 5.1 Stacker O-Ring Roller
Assembly
Purpose
To adjust the O-ring Assembly to prevent jams
in the Stacker and / or poor stacking quality.
Adjust Sequence
1.
Remove the Stacker O-ring Assembly
(PL 5.1 C).
NOTE: Keep the washer on the top of
the Stacker O-ring Assembly.
2.
Loosen the two screws.
3.
Press down and hold the Front Roller.
4.
Adjust the O-Ring Roller Ski until the Ski is
at the same height or just below the Roller.
5.
Tighten the two screws.
6.
Rotate the O-Ring Roller Ski upwards to an
45° angle.
7.
Retighten the two screws to ensure that
they do not work loose.
WASHER
FRONT ROLLER
O-RING
ROLLER SKI
SCREWS (2)
Figure 1.
STACKER O-RING
ASSEMBLY
Summary of Contents for FusionPunch II
Page 10: ...GBC FusionPunch II Service Manual GBC Training Process 12 2003 1 6 Notes ...
Page 24: ...GBC FusionPunch II Service Manual Final Actions 12 2003 1 20 Notes ...
Page 80: ...GBC FusionPunch II Service Manual RAP 6 2 Printer Connectivity 12 2003 2 56 Notes ...
Page 324: ...GBC FusionPunch II Service Manual Host Machine Enablement DocuColor 6060 12 2003 6 52 ...
Page 332: ...GBC FusionPunch II Service Manual Notes 12 2003 6 60 Notes ...
Page 354: ...GBC FusionPunch II Service Manual Principles of Operation 12 2003 6 82 Notes ...
Page 364: ...GBC FusionPunch II Service Manual Tag Numbers 12 2003 6 92 ...
Page 402: ...GBC FusionPunch II Service Manual Component Locators 12 2003 7 38 Notes ...
Page 414: ...GBC FusionPunch II Service Manual Preparing to Install a Bypass Kit 12 2003 8 12 Notes ...
Page 430: ...GBC FusionPunch II Service Manual Notes 12 2003 8 28 Notes ...