Quality RAP 5.6 Documents Not Punched
GBC FusionPunch II Service Manual
12/2003
3-13
14A. Activate the output and check AC
voltage across J9-NUI and J9-MT2 on
the Punch AC/DC Distribution PWB.
There is 110 VAC at this point.
Y
N
Replace the Punch AC/DC
Distribution PWB (PL 3.1).
Check the harness from J9-NUI on the
Punch AC/DC Distribution PWB to the
Punch Motor, and from J9-MT3 on the
Punch AC/DC Distribution PWB to the
Punch Motor. If the harness is OK,
replace the Punch Motor (PL 1.1F).
15.
Disconnect P/J30 on the Punch I/O
PWB. Activate the output again and
check LED L0B1 on the Punch I/O
PWB.
The LED is lit when the output is active.
Y
N
Check continuity between J1-HV07
on the Little Star Controller PWB
and P22-OUTB2 on the Punch I/O
PWB.
If the harness is faulty, replace it
(PL 6.1D). If the harness is OK,
replace the Little Star Controller
PWB (PL 3.1).
Check continuity and for shorts to
ground between P 30-OUTB1 on the
Punch I/O PWB and P11-MT3 on the
Punch AC/DC Distribution PWB.
The harness is OK.
Y
N
Replace the harness (PL 6.1A)
Go to Step 15A.
15A.The Punch Motor is enabled with a
ground on P/J11-MT4. When the output
is activated, there should be 0VDC at this
point. When the output is deactivated,
there should be +24 VDC.
Activate and then deactivate the output
and check for 0VDC and then +24 VDC
between P/J11-MT4 and P/J 12-0V on
the Punch AC/DC Distribution PWB.
There is 0VDC when the output is
activated and +24VDC when it is
deactivated.
Y
N
Replace the Punch I/O PWB
(PL 3.1).
Activate the output and check AC voltage
across J9-NUI and J9-MT3 on the Punch
AC/DC Distribution PWB.
There is 110 VAC at this point.
Y
N
Replace the Punch AC/DC
Distribution PWB (PL 3.1).
Check the harness from J9-NUI on the
Punch AC/DC Distribution PWB to the
Punch Motor, and from J9-MT3 on the
Punch AC/DC Distribution PWB to the
Punch Motor. If the harness is OK,
replace the Punch Motor (PL 1.1F).
Summary of Contents for FusionPunch II
Page 10: ...GBC FusionPunch II Service Manual GBC Training Process 12 2003 1 6 Notes ...
Page 24: ...GBC FusionPunch II Service Manual Final Actions 12 2003 1 20 Notes ...
Page 80: ...GBC FusionPunch II Service Manual RAP 6 2 Printer Connectivity 12 2003 2 56 Notes ...
Page 324: ...GBC FusionPunch II Service Manual Host Machine Enablement DocuColor 6060 12 2003 6 52 ...
Page 332: ...GBC FusionPunch II Service Manual Notes 12 2003 6 60 Notes ...
Page 354: ...GBC FusionPunch II Service Manual Principles of Operation 12 2003 6 82 Notes ...
Page 364: ...GBC FusionPunch II Service Manual Tag Numbers 12 2003 6 92 ...
Page 402: ...GBC FusionPunch II Service Manual Component Locators 12 2003 7 38 Notes ...
Page 414: ...GBC FusionPunch II Service Manual Preparing to Install a Bypass Kit 12 2003 8 12 Notes ...
Page 430: ...GBC FusionPunch II Service Manual Notes 12 2003 8 28 Notes ...