Quality RAP 5.3 Sets Do Not Offset
GBC FusionPunch II Service Manual
12/2003
3-5
There is +24 VDC with the output
deactivated and 0 VDC when it is
activated.
Y
N
Replace the harness between
Stacker I/O PWB P30 and Stacker
AC/DC Distribution PWB P11 (PL
6.2A).
Go to Step 17.
17. In the Diagnostics Mode, repeatedly
activate and deactivate the Stacker O-
Ring Motor output. Observe Relay3 on
the Stacker AC/DC Distribution PWB.
The Relay activates and deactivates as
the output is toggled.
Y
N
Replace the Stacker AC/DC
Distribution PWB (PL 3.2).
Go to Step 18.
18. In the Diagnostics Mode, activate the
Stacker O-Ring Motor output. Disconnect
P/J 8 on the Stacker AC/DC Distribution
PWB. Check for 110VAC across J8-NUI
and J8-MT2.
There is 110VAC at this point.
Y
N
Go to Section 2 RAP 1.2 AC Power
to the Stacker.
Check the harness between P8 on the
Stacker AC/DC Distribution PWB and the
O-Ring Motor. If the harness is OK,
replace the O-Ring Motor (PL 1.2B).
Summary of Contents for FusionPunch II
Page 10: ...GBC FusionPunch II Service Manual GBC Training Process 12 2003 1 6 Notes ...
Page 24: ...GBC FusionPunch II Service Manual Final Actions 12 2003 1 20 Notes ...
Page 80: ...GBC FusionPunch II Service Manual RAP 6 2 Printer Connectivity 12 2003 2 56 Notes ...
Page 324: ...GBC FusionPunch II Service Manual Host Machine Enablement DocuColor 6060 12 2003 6 52 ...
Page 332: ...GBC FusionPunch II Service Manual Notes 12 2003 6 60 Notes ...
Page 354: ...GBC FusionPunch II Service Manual Principles of Operation 12 2003 6 82 Notes ...
Page 364: ...GBC FusionPunch II Service Manual Tag Numbers 12 2003 6 92 ...
Page 402: ...GBC FusionPunch II Service Manual Component Locators 12 2003 7 38 Notes ...
Page 414: ...GBC FusionPunch II Service Manual Preparing to Install a Bypass Kit 12 2003 8 12 Notes ...
Page 430: ...GBC FusionPunch II Service Manual Notes 12 2003 8 28 Notes ...