GBC FusionPunch II Service Manual
REP 5.7 Rubber Drive Rollers
12/2003
4-24
REP 5.7 Rubber Drive Rollers
Parts List: 5.2 C
WARNING
Switch off the Main Power.
Disconnect the power cord.
Removal
1.
Perform REP 5.5 Bypass Motor and Timing
Belt, Steps 1 to 4.
2.
Remove the Bypass Flat Belt from the 2
Idler Rollers.
3.
Make a mark on the Drive Shaft next to the
Clamp Collar (Figure 1).
4.
Loosen:
4.1 the 2 Allen screws in the Timing Belt
Pulley (Figure 1).
4.2 the 3 Allen screws in the 3 Rubber
Drive Rollers (Figure 1).
4.3 the 2 Allen screws in the 2 Clamp
Collars (Figure 1).
5.
Remove:
5.1 the Timing Belt Pulley (Figure 1).
5.2 the E-ring (Figure 1).
6.
Slide the Drive Shaft towards the front of
the machine.
7.
Clean the Idler Rollers with Isopropyl
alcohol.
Replacement
1.
Reinstall the parts in the reverse order.
2.
Perform ADJ 5.5 Bypass Motor Timing Belt Tension.
CLAMP
COLLARS (2)
E-RING
MARK THE DRIVE SHAFT
RUBBER DRIVE
ROLLERS (3)
TIMING BELT
PULLEY
Figure 1.
Summary of Contents for FusionPunch II
Page 10: ...GBC FusionPunch II Service Manual GBC Training Process 12 2003 1 6 Notes ...
Page 24: ...GBC FusionPunch II Service Manual Final Actions 12 2003 1 20 Notes ...
Page 80: ...GBC FusionPunch II Service Manual RAP 6 2 Printer Connectivity 12 2003 2 56 Notes ...
Page 324: ...GBC FusionPunch II Service Manual Host Machine Enablement DocuColor 6060 12 2003 6 52 ...
Page 332: ...GBC FusionPunch II Service Manual Notes 12 2003 6 60 Notes ...
Page 354: ...GBC FusionPunch II Service Manual Principles of Operation 12 2003 6 82 Notes ...
Page 364: ...GBC FusionPunch II Service Manual Tag Numbers 12 2003 6 92 ...
Page 402: ...GBC FusionPunch II Service Manual Component Locators 12 2003 7 38 Notes ...
Page 414: ...GBC FusionPunch II Service Manual Preparing to Install a Bypass Kit 12 2003 8 12 Notes ...
Page 430: ...GBC FusionPunch II Service Manual Notes 12 2003 8 28 Notes ...