RAP 1.4 Punch +24VDC Power
GBC FusionPunch II Service Manual
12/2003
2-11
The voltage is +23.5 VDC to +25.5 VDC.
Y
N
Replace the Punch AC/DC
Distribution PWB (PL 3.1).
On the Stacker AC/DC Distribution PWB,
check for +24 VDC between P/J 14-24V
and P/J 14-0V.
The voltage is +23.5 VDC to +25.5 VDC.
Y
N
Replace the harness between the
Punch AC/DC Distribution PWB P/J
14 and the Stacker AC/DC
Distribution PWB P/J 14 (PL 6.1B).
The +24 VDC Power Circuit are OK.
Summary of Contents for FusionPunch II
Page 10: ...GBC FusionPunch II Service Manual GBC Training Process 12 2003 1 6 Notes ...
Page 24: ...GBC FusionPunch II Service Manual Final Actions 12 2003 1 20 Notes ...
Page 80: ...GBC FusionPunch II Service Manual RAP 6 2 Printer Connectivity 12 2003 2 56 Notes ...
Page 324: ...GBC FusionPunch II Service Manual Host Machine Enablement DocuColor 6060 12 2003 6 52 ...
Page 332: ...GBC FusionPunch II Service Manual Notes 12 2003 6 60 Notes ...
Page 354: ...GBC FusionPunch II Service Manual Principles of Operation 12 2003 6 82 Notes ...
Page 364: ...GBC FusionPunch II Service Manual Tag Numbers 12 2003 6 92 ...
Page 402: ...GBC FusionPunch II Service Manual Component Locators 12 2003 7 38 Notes ...
Page 414: ...GBC FusionPunch II Service Manual Preparing to Install a Bypass Kit 12 2003 8 12 Notes ...
Page 430: ...GBC FusionPunch II Service Manual Notes 12 2003 8 28 Notes ...