![FujiFilm Frontier-S DX100 Service Manual Download Page 276](http://html1.mh-extra.com/html/fujifilm/frontier-s-dx100/frontier-s-dx100_service-manual_2343465276.webp)
276
5.7Other adjustments
DX100 Service Manual
Print Head
1.
Unlock the carriage lock. (
)
2.
Visually check from the side of the CR Unit if no foreign object is attached on the
Print Head surface. (See
3.
Wipe off the foreign object with a dustless wipe if any.
Figure 5-101. Checking Method No.1 (2)
No.2
1.
Remove the Top Cover.
2.
Remove the Upper Cover.
3.
Remove the Rear Frame.
4.
Remove the Left Frame.
5.
Measure the resistance between the white harness and black harness on the AID
Board. (See
)
6.
Replace the AID Unit when the measured value is less than 1 M
7.
Replace the Print Head if the value is still less than 1 M
after
Figure 5-102. Checking Method No.2
C H E C K
P O I N T
Remove the Capping Unit before removing the foreign objects on the
Print Head. (
Be careful not to damage the Print Head surface.
CR Unit
Side view
Head surface
C H E C K
P O I N T
"4.6 Routing the cables and FFCs"
.
Black harness
White harness
AID Board
Bottom side
Summary of Contents for Frontier-S DX100
Page 13: ...13 DX100 Service Manual 7 3 Board Layout Diagram 299 7 4 Board Voltage List 303...
Page 14: ...C H A P T E R 1 PRODUCTDESCRIPTION...
Page 29: ...C H A P T E R 2 OPERATINGPRINCIPLES...
Page 46: ...C H A P T E R 3 TROUBLESHOOTING...
Page 76: ...C H A P T E R 4 DISASSEMBLY ASSEMBLY...
Page 208: ...C H A P T E R 5 ADJUSTMENT...
Page 279: ...C H A P T E R 6 MAINTENANCE...
Page 296: ...C H A P T E R 7 APPENDIX...
Page 298: ...298 7 2Connector Summary DX100 Service Manual 7 2 Connector Summary PW sensor...
Page 302: ...302 7 3Board Layout Diagram DX100 Service Manual Power Supply Board...