![FujiFilm Frontier-S DX100 Service Manual Download Page 237](http://html1.mh-extra.com/html/fujifilm/frontier-s-dx100/frontier-s-dx100_service-manual_2343465237.webp)
237
5.4Carriage Related Adjustment
DX100 Service Manual
C H E C K
P O I N T
Check how the Print Head touches the thickness gauge as follows.
When it doesn't contact
There is no resistance even after the CR Unit comes over the thickness
gauge approx. 30 mm from the side of the CR Unit and to the end of
gauge.
Top
Front
Print Head
Thickness
gauge
Approx. 30 mm
CR Unit
C H E C K
P O I N T
When it contacts
The thickness gauge does not go under the CR Unit more than about
30 mm from the side of the CR Unit, but moves together with the CR
Unit.
Top
Front
Print Head
Thickness
gauge
Approx. 30 mm
CR Unit
Summary of Contents for Frontier-S DX100
Page 13: ...13 DX100 Service Manual 7 3 Board Layout Diagram 299 7 4 Board Voltage List 303...
Page 14: ...C H A P T E R 1 PRODUCTDESCRIPTION...
Page 29: ...C H A P T E R 2 OPERATINGPRINCIPLES...
Page 46: ...C H A P T E R 3 TROUBLESHOOTING...
Page 76: ...C H A P T E R 4 DISASSEMBLY ASSEMBLY...
Page 208: ...C H A P T E R 5 ADJUSTMENT...
Page 279: ...C H A P T E R 6 MAINTENANCE...
Page 296: ...C H A P T E R 7 APPENDIX...
Page 298: ...298 7 2Connector Summary DX100 Service Manual 7 2 Connector Summary PW sensor...
Page 302: ...302 7 3Board Layout Diagram DX100 Service Manual Power Supply Board...