Index
Extreme Networks Consolidated XOS Hardware Installation Guide
162
site planning process, 16
small form pluggable GBIC.
See
Mini-GBIC
space requirements for the rack, 22
specifications
BlackDiamond 10K series switch, 155
mini-GBICs, 40–41
power cable, 30
standard rack installation, 62
standards
cabling, 32
commercial building, 32
grounding, 32
supported features
BlackDiamond 10K series switch, 39
SX mini-GBIC, 41
T
temperature, 18
tilt watch, 62
tools for installing equipment
blank front panel, 98
cable manager, 72
fan tray, 103
I/O modules, 94
mid-mount rack installation, 70
MSM-1/MSM-1XL module, 80
standard rack installation, 62
tools for removing equipment
fan tray, 102
I/O modules, 97
MSM-1/MSM-1XL module, 83
U
uninterruptable power supply
features, 31, 152
uninterruptible power supply
calculating amperage requirements, 32, 152
selecting, 32
transition time, 32, 152
unpacking instructions, 66–68
UPS.
See
uninterruptable power supply
W
wiring closet
airflow requirements, 19
electrostatic discharge, 21
floor coverings, 18
grounding, 18
humidity, 20, 21
temperature, 18
wiring terminals, 22
X
XENPAK module
description, 44
hot-swapping, 44
installing, 45
removing, 45
Z
ZX mini-GBIC, 41
Summary of Contents for BlackDiamond 8810
Page 8: ...Table of Contents Extreme Networks Consolidated XOS Hardware Installation Guide 8...
Page 12: ...Preface Extreme Networks Consolidated XOS Hardware Installation Guide 12...
Page 13: ...1 Site Preparation...
Page 14: ......
Page 36: ...Initial Management Access Extreme Networks Consolidated XOS Hardware Installation Guide 36...
Page 37: ...2 Common Characteristics...
Page 38: ......
Page 57: ...3 BlackDiamond 10K Series Switch...
Page 58: ......
Page 105: ...4 Aspen Switch...
Page 106: ......
Page 147: ...5 Appendixes...
Page 148: ......
Page 157: ...Extreme Networks Consolidated XOS Hardware Installation Guide 157...
Page 158: ...Technical Specifications Extreme Networks Consolidated XOS Hardware Installation Guide 158...