Meeting Power Requirements
Extreme Networks Consolidated XOS Hardware Installation Guide
151
Meeting Power Requirements
LAN Systems
WARNING!
This equipment is intended for intra-building. Intra-building connections are defined as cable runs that are located
in the same building as the unit.
This equipment can be connected between buildings if one of the following requirements are met:
●
Cable runs less then 140ft between buildings
●
Cable runs between buildings are directly buried.
●
Cable runs between buildings are in an underground conduit, where a continuous metallic cable
shield or a continuous metallic conduit containing the cable is bonded to each building grounding
electrode system.
PoE Devices
When connecting power over Ethernet (PoE) devices to a PoE switch, all connections between the PoE
device and the switch must remain within the same building and use a low-voltage power distribution
system per IEEE 802.3af.
Power Supply Requirements
Adhere to the following requirements to operate your Extreme Networks equipment safely:
●
Ensure that your equipment is placed in an area that accommodates the power consumption and
component heat dissipation specifications.
●
Ensure that your power supply meets the site power, AC power, or DC power requirements of the
network equipment.
●
Ensure that DC connections are made by an on-site electrician.
●
When connecting power to installed equipment, avoid connecting through an extension cord or
power strip.
●
If your switch includes more than one power supply, connect each power supply to different,
independent power sources.
If a power source fails, it will affect only the switch power supply to which it is connected. If all
switch power supplies are connected to a single power source, the entire switch is vulnerable to a
power source failure.
For power specifications for Extreme Networks products, see the Extreme Networks website at:
http://www.extremenetworks.com
Summary of Contents for BlackDiamond 8810
Page 8: ...Table of Contents Extreme Networks Consolidated XOS Hardware Installation Guide 8...
Page 12: ...Preface Extreme Networks Consolidated XOS Hardware Installation Guide 12...
Page 13: ...1 Site Preparation...
Page 14: ......
Page 36: ...Initial Management Access Extreme Networks Consolidated XOS Hardware Installation Guide 36...
Page 37: ...2 Common Characteristics...
Page 38: ......
Page 57: ...3 BlackDiamond 10K Series Switch...
Page 58: ......
Page 105: ...4 Aspen Switch...
Page 106: ......
Page 147: ...5 Appendixes...
Page 148: ......
Page 157: ...Extreme Networks Consolidated XOS Hardware Installation Guide 157...
Page 158: ...Technical Specifications Extreme Networks Consolidated XOS Hardware Installation Guide 158...