Aspen 8810 Chassis
Extreme Networks Consolidated XOS Hardware Installation Guide
114
Re-crating and Re-packing the Aspen 8810 Chassis
Follow these steps to ensure proper re-crating and re-packing for the Aspen 8810 chassis:
1
Mount the 19” helper bracket into the system rack using four mount screws
2
Loosen the eight mount screws holding the chassis from the system rack using a #2 Phillips
screwdriver.
3
Using two people, place one hand in the empty power supply bay and the other hand in the rear
slot on the back panel of the chassis.
4
Slowly guide the chassis out from the system rack using the 19” helper bracket.
5
Gently lift the chassis off from the 19” helper bracket onto wood pallet as shown in
Figure 58
.
Figure 58: Correct method for lifting the Aspen chassis
ASP017A
Summary of Contents for BlackDiamond 8810
Page 8: ...Table of Contents Extreme Networks Consolidated XOS Hardware Installation Guide 8...
Page 12: ...Preface Extreme Networks Consolidated XOS Hardware Installation Guide 12...
Page 13: ...1 Site Preparation...
Page 14: ......
Page 36: ...Initial Management Access Extreme Networks Consolidated XOS Hardware Installation Guide 36...
Page 37: ...2 Common Characteristics...
Page 38: ......
Page 57: ...3 BlackDiamond 10K Series Switch...
Page 58: ......
Page 105: ...4 Aspen Switch...
Page 106: ......
Page 147: ...5 Appendixes...
Page 148: ......
Page 157: ...Extreme Networks Consolidated XOS Hardware Installation Guide 157...
Page 158: ...Technical Specifications Extreme Networks Consolidated XOS Hardware Installation Guide 158...