Power Failure Recovery
MaxTester
405
When Using the Test Timer
When Using the Test Timer
Refer to
on page 193 for more information on test timer.
The test that was running will be re-created and started after a power
failure if conditions described above are met in addition with the following
test time conditions:
The start time has not expired during the power failure.
The stop time or the duration has not expired during the power failure.
Summary of Contents for MAX-800 Series
Page 1: ...www EXFO com User Guide MAX 800 Series MaxTester Application ETHERNET AND TRANSPORT TESTER...
Page 16: ......
Page 18: ......
Page 26: ......
Page 43: ...Test Setup Test Applications MaxTester 35 SONET SDH BERT For SDH BERT...
Page 48: ...Test Setup Test Applications 40 MAX 800 Series SONET SDH DSn PDH BERT For SDH...
Page 62: ......
Page 208: ......
Page 414: ......
Page 426: ......
Page 473: ...Glossary MaxTester 465 SONET DSn SDH PDH The GUI Grid indicates the TUG 2 x and TUG 3 x values...
Page 476: ......
Page 494: ...0 5 1 5 48 5 0 176 W d y K y K D...