417006-2311-0H3-A00 ECI
Telecom
Ltd.
Proprietary
iii
List of Figures
Figure
1-1: XDM-300 shelf ............................................................................................. 1-2
Figure
1-2: Basic XDM-300 shelf, horizontal installation ............................................... 1-3
Figure
1-3: Basic XDM-300 shelf, vertical Installation ................................................... 1-4
Figure
1-4: XDM-300 with one TPU on top of the shelf ................................................. 1-5
Figure
1-5: XDM-300 with two TPUs ............................................................................. 1-6
Figure
1-6: XDM-300 with an OCU and two TPUs ........................................................ 1-7
Figure
2-1: ETSI A rack closed view .............................................................................. 2-9
Figure
2-2: XDM-300 - typical horizontal installation in an ETSI A rack ...................... 2-11
Figure
2-3: Typical installation of XDM-300 and XDM-100 shelves in an
ETSI A rack .................................................................................................................. 2-12
Figure
2-4: Typical installation of XDM-300 and XDM-1000 shelves in an
ETSI A rack .................................................................................................................. 2-13
Figure
2-5: Grounding connections at typical site........................................................ 2-21
Figure
2-6: XDM-300 grounding posts ......................................................................... 2-23
Figure
2-7: XDM-300 CE label ..................................................................................... 2-24
Figure
2-8: Basic ESD warning symbol ....................................................................... 2-30
Figure
2-9: XDM-300 typical temporary EPA arrangement ......................................... 2-33
Figure
3-1: Components of horizontal XDM-300 installation ......................................... 3-3
Figure
3-2: Components of XDM-300 vertical installation ............................................. 3-6
Figure
3-3: XDM-300 - typical horizontal installation in an ETSI A rack ...................... 3-11
Figure
3-4: Typical horizontal installation of two XDM-300 shelves in an
ETSI A rack .................................................................................................................. 3-12
Figure
3-5: Typical horizontal installation of three basic XDM-300 shelves in
2200 mm ETSI A rack .................................................................................................. 3-13
Figure
3-6: Typical horizontal installation of three XDM-300 shelves with
TPUs in 2600 mm ETSI A racks .................................................................................. 3-14
Figure
3-7: XDM-300 - typical vertical installation in an ETSI A rack .......................... 3-15
Figure
3-8: Location of xRAP-B grounding stud .......................................................... 3-19
Figure
3-9: Identification of xRAP-B cable routes ........................................................ 3-19
Figure
3-10: Connecting DC power cables to the xRAP-B .......................................... 3-20
Figure
3-11: Identification of xRAP-B connectors ........................................................ 3-21
Figure
3-12: Installation of xRAP-B circuit breakers .................................................... 3-22
Figure
3-13: Location of xRAP-100 grounding stud..................................................... 3-26
Figure
3-14: Identification of xRAP-100 cable routes .................................................. 3-27
Figure
3-15: Connecting DC power cables to the xRAP-100 ...................................... 3-27
Figure
3-16: Identification of xRAP-100 connectors .................................................... 3-28
Summary of Contents for XDM-300
Page 1: ...XDM 300 Installation and Maintenance Manual Version 7 417006 2311 0H3 A00...
Page 2: ......
Page 8: ......