Before you start:
Each cable consists of two stranded copper leads with a cross section of
50 mm
2
, one red and the other black. Each lead is terminated with a two-hole
compression lug from the installation parts kit supplied with the equipment.
If appropriate leads have already been prepared at the prescribed rack location,
make sure that the leads are not connected to any live voltage source before
attaching the lugs.
To prepare a DC power cable:
1.
Strip about 22 mm of the red lead jacket.
2.
Insert all the lead strands into the lug sleeve.
3.
Press at two or three different points on the lug sleeve using an appropriate
crimping tool and die. The recommended tools are Panduit CT-720
crimping tool with CD-720-2 die, Klauke K18 crimping tool with D50 die,
or equivalent.
4.
Repeat Steps 1 to 3 for the black lead.
To install the xRAP-B:
|
Attach the xRAP-B to the rack side rails in the top position, and secure it
with the four screws, washers, and nuts supplied in the installation parts kit.
To ground the xRAP-B:
1.
The xRAP-B grounding stud is located on its bottom cover. Use the
following figure to identify it.
2.
If necessary, prepare a grounding lead in accordance with the requirements
described in Grounding Requirements (on page
).
3.
Connect the lug at one end of the grounding lead to the xRAP-B grounding
stud using a spring washer and nut.
4.
Connect the lug at the other end of the grounding lead to the rack
grounding stud.