XDM-300 Installation and
Maintenance Manual
Equipment
Installation
417006-2311-0H3-A00 ECI
Telecom
Ltd.
Proprietary
3-9
Unpacking and Performing
Visual Inspection
Before you start:
Before unpacking, make a preliminary inspection of the shipping boxes.
Evidence of damage should be reported immediately to the carrier, the project
manager, and your local ECI Telecom representative.
C
AUTION
:
Static Sensitive Devices
Proper handling and grounding precautions required
XDM-300 equipment contains components sensitive to
electrostatic discharge (ESD). To prevent ESD damage,
strictly observe all the precautions listed in Protection against
ESD (on page
). Keep parts and cards in their antistatic
packaging material until you are ready to install them.
The use of an antistatic wrist strap connected to a grounded
equipment frame or rack is recommended when handling
cards and modules during installation, removal, or connection
to internal connectors.
You must unpack the equipment on a clean flat surface.
To unpack the equipment:
1.
Place the shipping boxes with the top upwards, cut the sealing tape using a
short knife so as not to damage the internal items, and open the top flaps.
2.
Remove the items contained in the box and inspect each item for damage.
Check for loose parts or any visual damage to the rack, shelf, and auxiliary
equipment. Also check the integrity of all the connectors, leads, and cables.
N
OTE
:
Do not remove plastic covers from optical connectors
until optical cables are connected to them.
3.
Search the shipping boxes for any additional small items that may be
present.
Summary of Contents for XDM-300
Page 1: ...XDM 300 Installation and Maintenance Manual Version 7 417006 2311 0H3 A00...
Page 2: ......
Page 8: ......