DX380LC-7
Inspection, Maintenance and Adjustment
4-48
500 Hour / 3 Month Service
Perform All Daily, 50 and 250 Hour Service
Checks
Track Spring - Check
Check the track tension every 500 hours. If necessary, adjust
the track spring.
NOTE:
If the unit has been running or working in water, the
track spring must be greased on a 10 hour/daily
basis.
Swing Gear and Pinion - Lubricate
1.
Remove inspection cover on the main frame and inspect
the condition of the grease. Inspect for water or other
contaminants on the gear teeth.
NOTE:
The upper structure must be rotated a little at a
time so the entire face of the swing gear can be
lubricated. Use extreme caution when
performing this operation.
2.
If water or other contaminations are found, remove lower
access cover bottom of the track frame so the gear teeth
can be thoroughly cleaned and lubricated.
3.
Install access covers after lubricating gear teeth.
WARNING
AVOID DEATH OR SERIOUS INJURY
Greasing swing gear and pinion must be done by only one
person.
DS1900860
Figure 46