Completing the Installation
DLE28-MA User’s Guide
3-11
a.
Check that the power is turned on for the device at the other end of
the link.
b. Verify proper crossing over of fiber strands between the
applicable port on the DLE28-MA and the fiber optic device at the
other end of the fiber optic link segment.
c.
Verify that the fiber connection meets the dB loss specifications
outlined in Chapter 2.
3.7
COMPLETING THE INSTALLATION
The DLE28-MA is now ready to be set up through Local Management.
Refer to Chapter 5, Local Management, to configure the modules and
DLM6C-AA chassis.
The port RX LED flashes green and amber during bootup.