
SERIES 4000 12/16V SERVICE MANUAL
C 025.05.10 –
ASSEMBLY OF GEAR TRAIN (GEAR CASE END)
Perform the following steps to assemble gear train (gear case end). Refer to section C 025.05.08.
1. Measure basic bore (3) in idler gear (2). See Figure 159.
1. Bushing
3. Bushing Bore
2. Idler Gear
Figure 159
Installing Bushing Idler Gear
2. Place idler gear on suitable bench or rest to ensure that when bushing (1) is installed
there is no interference. See Figure 159.
To avoid injury when using liquid nitrogen, wear protective
clothing, gloves and closed shoes. Do not allow the liquid
nitrogen to come into contact with exposed body parts.
Danger of freezing body parts and suffocation will occur.
3. Cool bushing in liquid nitrogen.
All information subject to change without notice.
C -222
Copyright © DETROIT DIESEL CORPORATION
Summary of Contents for 4000 Series
Page 1: ......
Page 2: ......
Page 6: ......
Page 2631: ...E TROUBLESHOOTING Section Page E 010 MECHANICAL TROUBLESHOOTING E 3 E 020 TESTING E 45 ...
Page 2681: ...F PREVENTIVE MAINTENANCE Section Page F 010 Rockford Fan Clutch F 3 ...