Section 2: Installation and Setup
Roadie HD+35K User Manual
2-3
020-100340-02 Rev. 1 (01-2010)
Confirm that the ballast's three-phase status lights are ON and that the adjacent voltmeter displays an
acceptable AC level for your ballast, and region. Refer to
Section 6 Specifications
for details. Then switch
the ballast’s breaker/power switch to the ON position.
NOTE:
The ballast's internal fan is the only indication whether or not the breaker/power switch is ON. Lights
on the ballast indicate only that the ballast is plugged in.
Figure 2-3
Ballast Connection and Switch On
Head-to-AC
Connect the Christie-supplied IEC 320 (220V) 15-amp line cord to your AC supply.
Do not substitute
other cords
. Input power required is 200 - 240 VAC (nominal), 50/60 Hz @ 3A for 208V. Refer to
Figure
2-4
.
Voltmeter (400V)
3-phase
Interlocks
Control
+ DC
– DC
6’ line cord
Connect to AC supply:
• 200 VAC in N. America
• 208 VAC in Japan
• 380/400/415 VAC in Europe
(Modify plug as necessary)
Connect
to projector
Breaker/Power
Switch in ON position
Check
status
1.
2.
4.
3.
NOTE: Internal
switch setting must match AC available at the site.
Incoming Line Voltage
Summary of Contents for Roadie HD+35K
Page 1: ...Roadie HD 35K U S E R M A N U A L 020 100340 02 ...
Page 2: ......
Page 3: ...Roadie HD 35K U S E R M A N U A L 020 100340 02 ...
Page 66: ......
Page 160: ......
Page 166: ......
Page 182: ......
Page 190: ......
Page 191: ......