Monitor and control equipment
i-Vu CCN Pro 4.2
49
9
Click
OK
.
Type
Schedule runs
Weekly
Every week on the specified days
Date
On a single, specified date
Date Range
Between two specified dates
Date List
On multiple, specified dates
Wildcard
According to a repeating pattern (For example, the second Tuesday of
every month)
Continuous
Continuously between specified times on two separate dates
Dated Weekly
Weekly between a start date and an end date (For example, the
summer break in the school year)
To apply a schedule to a group of equipment
You must create a group, then add members (equipment) to the group before you can apply a schedule.
1
In the
User
view, on the navigation tree, select
Scheduling Groups
.
2
Click
Add
.
3
Type a name for the new schedule group in the
Name
field.
Optional: Change the default
Reference name
.
4
Click
OK
.
5
On the tree, click the plus sign (
+
) next to
Scheduling Groups
.
6
In the navigation pane, select the group you want to add items to.
7
Click the
Members
button at the top of the action pane.
8
On the selection tree at the right, select a piece of equipment.
9
Click
Add
.
TIP
Use the
Raise
and
Lower
buttons to reorder items in the group list. Changing the order is for your
viewing convenience and does not affect the system.
10
Click
OK
.
11
Click
Schedules
, then
Configure
.
Using schedule categories
Occupancy is i-Vu CCN Pro’s only default schedule category. Occupancy is a binary schedule category that
allows a zone or piece of equipment to be defined as On when a space is occupied and Off when it is
unoccupied.
You can add custom schedule categories to handle other conditions if the equipment’s control program
includes a Time Clock microblock. For example, you can add a multi-state schedule category to control lights: