Operating i-Vu CCN Pro
18
i-Vu CCN Pro 4.2
1
Right-click the device or devices (CTRL-click) in the
System Setup
table
2
Choose
Download
from drop down menu.
Working with Universal and Comfort Controllers (CCN)
Universal Controllers (UC) and Comfort Controllers (CC) that are scanned into the system in
System Setup
will
be assigned a generic equipment and view file, which have setpoint control, but no additional pre-mapped
I/O. In order to have additional I/O points available for graphic display, you must use
ApplicationBuilder
to
create the custom equipment files to support your application. These files will map the CCN variables to i-Vu
BACnet points.
In
ApplicationBuilder
, you can create
CCN Values Only
,
Read Integration
, or
Link Integration
custom
equipments for UC/CC that are tailored for your specific application.
ApplicationBuilder
can also create some stand-alone applications for Consumable Reports for:
•
Energy Meters
•
Non-linear flow meters
•
Energy (BTU) consumption
•
Equipment Runtime
These options can also be added to
CCN Values Only
and
Link Integration
custom equipments and only
require mapping of the points to be monitored.
Once the equipment files and the view file are
uploaded to i-Vu CCN Pro
(page 22), these points can be
assigned to custom graphic elements, which are created in
ViewBuilder.
Because CC’s will likely control multiple pieces of HVAC equipment, expansion controllers associated with
CC’s must be added to i-Vu CCN Pro from
System Setup.
This allows separate setpoint and schedule control
of these multiple physical equipments from a single CC. These expansion controllers support the additional
equipment and view files required for these “separate” systems.
Create custom equipment files for UC/CC's that link only to CNN points
ApplicationBuilder creates an equipment file for the UC/CC, which maps the I/O points that are required for
one or more applications. Once these files are created, these linked I/O points can then be associated with
ViewBuilder graphics.
NOTE
To have a
Prime Variable
, (a temperature that is displayed in a color oval when the CC or UC is shown
in a site or area equipment list), the
Schedule and Setpoint
option must be selected when creating the
equipment file.
1
Start ApplicationBuilder. (Windows
Start
>
All Programs
>
iVu Tools 4.2
)
2
Click
Create Equipment
.
3
Select equipment type:
Custom Equipment
>
CCN Values Only.
4
Click
Next
.
5
Type a name for the custom equipment (i.e., Hot Water system) next to
Equipment Name
.
6
Enable
English
or
Metric
units.
7
Select options from the drop down menus.