7
7
7-24
7-24
Installation > Installation Procedure > Connecting with the Perfect Binder
Installation > Installation Procedure > Connecting with the Perfect Binder
8) Check the height between Finisher and the High Capacity Stacker.
CAUTION:
Height difference should be /- 2 mm.
Execute "Height Adjustment" if the difference is +/- 2 mm or more.
High Capacity Stacker
Finisher
9) Install the Rear Small Cover. (1 Screw)
10)
Install the Shunt Cable.
• 2 Screws (RS tightening; M4x10)
x2
F-7-65
F-7-66
Connecting with the Perfect Binder
NOTE:
Be sure the power of the host machine is turned OFF and the power plug is
disconnected from the outlet.
1) IInstall the Latch Receiver (Front) and Latch Receiver (Rear) in the left side of the Perfect
Binder.
• 4 Screws (RS tightening; M4x10)
CAUTION:
Confirm the engraved mark on each latch plate when attaching.
• Latch Receiver (Front) : F
• Latch Receiver (Rear) : R
R
F
Latch Receiver (Front)
Latch Receiver (Rear)
x4
F-7-67
Summary of Contents for Finisher-AK1
Page 8: ... Notes Before Servicing Points to Note at Cleaning Safety Precautions ...
Page 10: ...1 1 Product Outline Product Outline Product Specifications Names of Parts ...
Page 55: ...3 3 Periodic Servicing Periodic Servicing User Maintenance Maintenance and Inspection ...
Page 309: ...6 6 Troubleshooting Troubleshooting Upgrading ...
Page 361: ... Service Tools Solvents and Oils List of Signals General Circuit Diagram Appendix ...