5
5
5-23
5-23
Adjustment > Adjustment at Time of Parts Replacement > Adjusting the Height of Corrugation Roller for Stack Delivery > Procedure
Adjustment > Adjustment at Time of Parts Replacement > Adjusting the Height of Corrugation Roller for Stack Delivery > Procedure
7) Open the Swing Guide [1], fold A4/LTR size heavy paper [2] in half length-wide (e.g., card
board) and place it by pushing it against the stopper [4] so that it becomes parallel to the
Intermediate Process Tray [3]. Then, close the Swing Guide [1].
[3]
[2]
[1]
[4]
[1]
[2]
F-5-49
8) Measure the distance [C] between the bottom side [A] of the heavy paper and the upper
side [B] of the Corrugation Roller [2]. Then, check that the distance [C] is within the range of
standard value (2.7 +/- 1 mm in orthogonal direction against the surface of the Intermediate
Process Tray [3]). If the distance [C] is out of the range, take a note to write down the
excess of the measured value over the range.
NOTE:
Since the heavy paper [1] placed in step 7 is parallel to the surface of the Intermediate
Process Tray [3], it becomes possible to measure the distance [C] in orthogonal direction
against the surface of the Intermediate Process Tray.
[B]
[C]
[1]
[A]
[2]
[C]
[2]
[A]
[1]
[3]
[B]
F-5-50
Summary of Contents for Finisher-AK1
Page 8: ... Notes Before Servicing Points to Note at Cleaning Safety Precautions ...
Page 10: ...1 1 Product Outline Product Outline Product Specifications Names of Parts ...
Page 55: ...3 3 Periodic Servicing Periodic Servicing User Maintenance Maintenance and Inspection ...
Page 309: ...6 6 Troubleshooting Troubleshooting Upgrading ...
Page 361: ... Service Tools Solvents and Oils List of Signals General Circuit Diagram Appendix ...