7
7
7-21
7-21
Installation > Installation Procedure > Connecting with the High Capacity Stacker
Installation > Installation Procedure > Connecting with the High Capacity Stacker
11)
Install the Rear Cover. (8 Screws)
12)
Install the Rear Small Cover. (1 Screw)
13)
Install the Shunt Cable.
• 2 Screws (RS tightening; M4x10)
x2
F-7-57
Connecting with the High Capacity Stacker
NOTE:
Be sure the power of the host machine is turned OFF and the power plug is
disconnected from the outlet.
1) Remove the 3 Face Covers of the High Capacity Stacker left side.
(The removed covers and screws will not in use anymore.)
• 4 Screws
Screw
x4
Screw
F-7-58
Summary of Contents for Finisher-AK1
Page 8: ... Notes Before Servicing Points to Note at Cleaning Safety Precautions ...
Page 10: ...1 1 Product Outline Product Outline Product Specifications Names of Parts ...
Page 55: ...3 3 Periodic Servicing Periodic Servicing User Maintenance Maintenance and Inspection ...
Page 309: ...6 6 Troubleshooting Troubleshooting Upgrading ...
Page 361: ... Service Tools Solvents and Oils List of Signals General Circuit Diagram Appendix ...