4
4
4-49
4-49
Parts Replacing and Cleaning > Feed Assembly > Removing the Side Registration Shift Unit > Procedure
Parts Replacing and Cleaning > Feed Assembly > Removing the Side Registration Shift Unit > Procedure
7) Move the Shift Shaft [1] to remove the Side Registration Sensor PCB [2].
• 2 Screws [3]
[3]
[1]
[2]
x2
F-4-102
Removing the Side Registration Shift Unit
■
Preparation
1) Open the Front Cover.
2) Separate the finisher from the host machine.(Refer to page 4-18)
3) Remove the Rear Upper Cover (Right).(Refer to page 4-21)
4) Remove the Rear Upper Cover (Left).(Refer to page 4-21)
5) Remove the Rear Cover.(Refer to page 4-20)
6) Remove the Inner Cover (Upper).(Refer to page 4-22)
■
Procedure
1) Remove the Latch Base Cover [1].
• 3 Screws [2]
x3
F-4-103
Summary of Contents for Finisher-AK1
Page 8: ... Notes Before Servicing Points to Note at Cleaning Safety Precautions ...
Page 10: ...1 1 Product Outline Product Outline Product Specifications Names of Parts ...
Page 55: ...3 3 Periodic Servicing Periodic Servicing User Maintenance Maintenance and Inspection ...
Page 309: ...6 6 Troubleshooting Troubleshooting Upgrading ...
Page 361: ... Service Tools Solvents and Oils List of Signals General Circuit Diagram Appendix ...