4
4
4-66
4-66
Parts Replacing and Cleaning > Intermediate Process Tray Assembly > Removing the Stack Delivery Upper Roller > Procedure
Parts Replacing and Cleaning > Intermediate Process Tray Assembly > Removing the Stack Delivery Upper Roller > Procedure
Removing the Stack Delivery Upper Roller
■
Preparation
1) Remove the Stack Wall (Lower).(Refer to page 4-29)
2) Remove the Stack Wall (Upper).(Refer to page 4-27)
3) Remove the Neat Stack Unit (Lower).(Refer to page 4-59)
4) Remove the Process Tray Unit.(Refer to page 4-62)
■
Procedure
1) Remove the 2 Tension Springs [1].
[1]
[1]
2) Turn the Process Tray Unit [2] upright with the Front Plate [1] side down.
[2]
[1]
F-4-153
F-4-154
3) Remove the Swing Guide [1].
• 2 Screws [2]
x2
[2]
[1]
4) Remove one side of the belt [1] from the pulley [2].
• 1 E-ring [3]
• 1 Belt Retainer [4]
[1]
[2]
[3]
[4]
F-4-155
F-4-156
Summary of Contents for Finisher-AK1
Page 8: ... Notes Before Servicing Points to Note at Cleaning Safety Precautions ...
Page 10: ...1 1 Product Outline Product Outline Product Specifications Names of Parts ...
Page 55: ...3 3 Periodic Servicing Periodic Servicing User Maintenance Maintenance and Inspection ...
Page 309: ...6 6 Troubleshooting Troubleshooting Upgrading ...
Page 361: ... Service Tools Solvents and Oils List of Signals General Circuit Diagram Appendix ...