7
7
7-9
7-9
Installation > Installation Procedure > Before Installing the Finisher
Installation > Installation Procedure > Before Installing the Finisher
7) Remove the Screw on the Latch Plate (Front).
(The removed Screw will be used when connecting the upstream equipment.)
Latch Plate (Front)
Screw
8) Remove the Rear Small Cover in the direction of the arrow.
• 1 Screw
• 2 Hooks
Hook
F-7-18
F-7-19
9) Remove the screw on the Latch Plate (Rear) and bring the hinge down toward the front.
(The removed Screw will be used when connecting the upstream equipment.)
Latch Plate (Rear)
Screw
F-7-20
Summary of Contents for Finisher-AK1
Page 8: ... Notes Before Servicing Points to Note at Cleaning Safety Precautions ...
Page 10: ...1 1 Product Outline Product Outline Product Specifications Names of Parts ...
Page 55: ...3 3 Periodic Servicing Periodic Servicing User Maintenance Maintenance and Inspection ...
Page 309: ...6 6 Troubleshooting Troubleshooting Upgrading ...
Page 361: ... Service Tools Solvents and Oils List of Signals General Circuit Diagram Appendix ...