7
7
7-17
7-17
Installation > Installation Procedure > Connecting with the the Professional Puncher Integration Unit
Installation > Installation Procedure > Connecting with the the Professional Puncher Integration Unit
4) Lower the Latch Plate (Front) and fix it.
• 1 Screw (Use the Screw removed in the step 7) of "Before Installing the Finisher")
Screw
Latch Plate (Front)
5) Close the Finisher Front Cover.
6) Move the Latch Plate (Rear) in the direction of the arrow and insert it to the pin to fix it.
• 1 Screw (Use the Screw removed in the step 9) of "Before Installing the Finisher")
Latch Plate (Rear)
Screw
F-7-42
F-7-43
7) Check the height between Finisher and the Professional Puncher Integration Unit.
CAUTION:
Height difference should be /- 2 mm.
Execute "Height Adjustment" if the difference is +/- 2 mm or more.
Finisher
Professional Puncher
Integration Unit
8) Install the Rear Small Cover. (1 Screw)
9) Install the Shunt Cable.
• 2 Screws (RS tightening; M4x10)
x2
F-7-44
F-7-45
Summary of Contents for Finisher-AK1
Page 8: ... Notes Before Servicing Points to Note at Cleaning Safety Precautions ...
Page 10: ...1 1 Product Outline Product Outline Product Specifications Names of Parts ...
Page 55: ...3 3 Periodic Servicing Periodic Servicing User Maintenance Maintenance and Inspection ...
Page 309: ...6 6 Troubleshooting Troubleshooting Upgrading ...
Page 361: ... Service Tools Solvents and Oils List of Signals General Circuit Diagram Appendix ...