2
2
2-18
2-18
Technology > Intermediate Process Tray Assembly > Basic Sequence of Operations
Technology > Intermediate Process Tray Assembly > Basic Sequence of Operations
[1]
[2]
PS6
PS17
Finisher controller PCB
[1] Lower delivery sensor signal
PS6 : Lower delivery sensor
[2] Handling tray sensor signal
PS17 : Process tray paper
F-2-23
Basic Sequence of Operations
The intermediary tray block uses the following 4 sequences of operations:
1. Stacking Operation [1]
Deposits sheets coming front the transport block in the intermediary tray.
2. Aligning Operation [2]
Switches over the point of depositing stacks between the front and the rear of the tray. (in
shift mode)
3. Stapling Operation [3]
Staples a stack of sheets at a specific point. (in staple mode)
4. Delivery Operation [4]
Discharges the sheets deposited in the intermediary tray to the tray A or the tray B.
5.Neat Alignment Operation
This is an alignment mechanism that aligns the front and rear edges as well as the feed
direction of paper by using the Alignment Plate and the Return Roller when ejecting paper
to the tray.
The following are the particulars of the individual operations:
[1]
[2]
[3]
[4]
F-2-24
Summary of Contents for Finisher-AK1
Page 8: ... Notes Before Servicing Points to Note at Cleaning Safety Precautions ...
Page 10: ...1 1 Product Outline Product Outline Product Specifications Names of Parts ...
Page 55: ...3 3 Periodic Servicing Periodic Servicing User Maintenance Maintenance and Inspection ...
Page 309: ...6 6 Troubleshooting Troubleshooting Upgrading ...
Page 361: ... Service Tools Solvents and Oils List of Signals General Circuit Diagram Appendix ...