4
4
4-59
4-59
Parts Replacing and Cleaning > Intermediate Process Tray Assembly > Removing the Neat Stack Unit (Lower) > Procedure
Parts Replacing and Cleaning > Intermediate Process Tray Assembly > Removing the Neat Stack Unit (Lower) > Procedure
CAUTION:
When putting down the Neat Stack Unit (Upper), be sure to place the unit with the 2
Alignment Plates [1] facing up.
[1]
[1]
F-4-134
Removing the Neat Stack Unit (Lower)
■
Preparation
1) Remove the Stack Wall (Lower).(Refer to page 4-29)
2) Remove the Stack Wall (Upper).(Refer to page 4-27)
■
Procedure
CAUTION:
When replacing or installing/removing the component parts of the Neat Stack Unit
(Lower), be sure to perform the following adjustment.
• Adjusting the Alignment Position of the Lower Neat Alignment Plate(Refer to page
1) Lift the Tray A [1] to the upper limit position.
2) Open the Edge Saddle [2] and the 5 Wire Saddles [3], and disconnect the 3 connectors [4].
[1]
x2
x2
x4
[2]
[4]
[4]
[3]
[3]
F-4-135
Summary of Contents for Finisher-AK1
Page 8: ... Notes Before Servicing Points to Note at Cleaning Safety Precautions ...
Page 10: ...1 1 Product Outline Product Outline Product Specifications Names of Parts ...
Page 55: ...3 3 Periodic Servicing Periodic Servicing User Maintenance Maintenance and Inspection ...
Page 309: ...6 6 Troubleshooting Troubleshooting Upgrading ...
Page 361: ... Service Tools Solvents and Oils List of Signals General Circuit Diagram Appendix ...