7
7
7-5
7-5
Installation > Unpacking
Installation > Unpacking
Unpacking
1) Take out the equipment from the package.
2) Take the included package out.
CAUTION:
To unpack the equipment, depends on the holding position, can cause the
transformation of the equipment, or even breakage.
Don't hold it by the transportation guide.
Transportation Guide
F-7-7
3) Remove the packing material on the top of this equipment and bring down the plastic
material to the bottom.
Packing Material
Plastic Material
4) Lift up one side to remove the packaging material at the bottom, move the plastic material
to one side and slowly bring the equipment down.
Packing Material
Plastic Material
F-7-8
F-7-9
Summary of Contents for Finisher-AK1
Page 8: ... Notes Before Servicing Points to Note at Cleaning Safety Precautions ...
Page 10: ...1 1 Product Outline Product Outline Product Specifications Names of Parts ...
Page 55: ...3 3 Periodic Servicing Periodic Servicing User Maintenance Maintenance and Inspection ...
Page 309: ...6 6 Troubleshooting Troubleshooting Upgrading ...
Page 361: ... Service Tools Solvents and Oils List of Signals General Circuit Diagram Appendix ...