Section Rev. February 2009
Section 4: Pinsetter Cycles
4-17
First Ball - Foul
When a bowler steps on the foul line, a beam of light over the foul line is interrupted. A signal is then
sent to the Pinsetter CPU. The pinsetter must sweep all pins and set ten new pins. The bowler receives
zero pins for the first ball and has only one chance to knock down the new pins. Refer to
Figure 4-10.
(3)
LOAD PINS
IN TABLE
(4)
STROKE LIMITER
SOLENOID
ENERGIZED
(8
)
RAISE
SWEEP
(7)
PRELOAD
PINS TO
TABLE
(6)
READY
FOR SECOND
BALL
(10)
OPEN
GRIPPERS
TO PRELOAD
PINS
(16)
SWEEP
FORWARD
(18)
SWITCH
CLUSTER
(17)
SWEEP DOWN
(1)
TABLE
HOME/UP
(2)
CCW
(5)
CW
(20)
DETECTION
STROKE
(13)
SWEEP
(19)
OOR
SWITCH
(1
1)
CLOSE
GRIPPER
S
(12)
OPEN
GRIPPER
S
SET
NEW
PINS
(14)
OPEN
GRIPPER
S
(15)
FOU
L
D
ETEC
T
O
R
IGNORE
PIN
HOLDERS
(9)
NEW
PINSETTING
STROKE
A
A
A
A
B
C
D
D
C
B
G
G
SM
SM
SM
SM
(21)
DETECTION
HEIGHT
ST
ST
(22)
SPOTTING
TONGS
OPEN
Figure 4-10. First Ball Foul Cycle.
(1) TABLE HOME/UP
(2) COUNTERCLOCKWISE
(3) LOAD PINS IN TABLE
(4) STROKE LIMITER SOLENOID
(5) CLOCKWISE
(6) READY FOR SECOND BALL
ENERGIZED
(7) PRELOAD PINS TO TABLE
(8) RAISE SWEEP
(9) NEW PINSETTING STROKE
(10) OPEN GRIPPERS TO PRELOAD PINS (11) CLOSE GRIPPERS
(12) OPEN GRIPPERS SET NEW PINS
(13) SWEEP
(14) OPEN GRIPPERS
(15) FOUL DETECTOR IGNORE PIN
HOLDERS
(16) SWEEP FORWARD
(17) SWEEP DOWN
(18) SWITCH CLUSTER
(19) OUT-OF-RANGE SWITCH
(20) DETECTION STROKE
(21) DETECTION HEIGHT
(22) SPOTTING TONGS OPEN
1. A foul signal is sent to the Pinsetter CPU.
2. A ball detect occurs.
3. In response to the ball detect signal the sweep release solenoid energizes to lower the sweep into
the guard position actuating switch “G”. The ball door solenoid energizes, locking the ball door
for three seconds.
Summary of Contents for GS-X Series
Page 1: ...Operations Service Manual GS X Pinsetter with Advanced CE Guarding March 2017 47 902748 000...
Page 4: ...2 Safety Section Section Rev February 2017 Intentionally Blank Page...
Page 15: ...Section Rev February 2017 Safety Section 13 GS Safetty Mirror Safety Mirror...
Page 36: ...1 2 Section 1 Operations Section Rev February 2009 Intentionally Blank Page...
Page 51: ...Section Rev February 2009 Section 1 Operations 1 17 Figure 1 14 Setting New Pins...
Page 94: ...3 2 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Page 131: ...Section Rev February 2017 Section 3 Nexgen Electronics 3 39 Intentionally Blank...
Page 134: ...3 42 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Page 136: ...3 44 Section 3 Nexgen Electronics Section Rev February 2017 Back of 11 x 17 Here...
Page 150: ...3 58 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Page 152: ...4 2 Section 4 Pinsetter Cycles Section Rev February 2009 Intentionally Blank Page...
Page 158: ...4 8 Section 4 Pinsetter Cycles Section Rev February 2009 Figure 4 5 Pinsetter Cycles...
Page 176: ...5 2 Section 5 Adjustments Section Rev February 2017 Intentionally Blank Page...
Page 226: ...6 2 Section 6 Troubleshooting Section Rev February 2009 Intentionally Blank Page...
Page 246: ...6 22 Section 6 Troubleshooting Section Rev February 2009 Intentionally Blank...
Page 257: ...Section Rev February 2009 Section 7 Preventative Maintenance 7 11...
Page 284: ...7 38 Section 7 Preventative Maintenance Section Rev February 2009...
Page 286: ...8 2 Section 8 Servicing Section Rev February 2009 Intentionally Blank Page...