Section Rev. February 2009
Section 4: Pinsetter Cycles
4-3
Section 4: Pinsetter Cycles
GENERAL INFORMATION
The GS-Series Pinsetter is capable of performing many different cycles in reaction to a bowler throwing
a ball.
Every cycle can be divided into three segments. Refer to
Figure 4-1.
The first segment is the detection
stroke. Refer to
Figure 4-2.
In this segment, the table is lowered to detect or find out the results of the
ball hitting the pins. The sweep segment occurs after the detection stoke once the table returns to home
position. During the sweep segment, deadwood is cleared from the pin deck and flat gutters. Refer to
Figure 4-3
. The final segment is the preparation stroke in which the pinsetter readies itself for the next
ball. The table may lower for a short stroke if pins are respotted back onto the pin deck if they were
lifted by the table during the detection segment or a long stroke if new pins are set on the pin deck in
preparation for a new frame. Refer to
Figure 4-4.
A
A
B C D
(4)
CCW
A
A
B
C
D
(5)
CW
(1)
DETECTION
(2)
SWEEP
(3)
PREPARATION
(2)
SWEEP
(6)
STANDING PIN
HEIGHT
(6)
STANDING PIN
HEIGHT
(7)
NEW PIN
SETTING HEIGHT
Figure 4-1. Cycle Segments
(1) DETECTION
(2) SWEEP
(3) PREPARATION
(4) COUNTERCLOCKWISE
(5) CLOCKWISE
(6) STANDING PIN HEIGHT
(7) NEW PIN SETTING HEIGHT
Summary of Contents for GS-X Series
Page 1: ...Operations Service Manual GS X Pinsetter with Advanced CE Guarding March 2017 47 902748 000...
Page 4: ...2 Safety Section Section Rev February 2017 Intentionally Blank Page...
Page 15: ...Section Rev February 2017 Safety Section 13 GS Safetty Mirror Safety Mirror...
Page 36: ...1 2 Section 1 Operations Section Rev February 2009 Intentionally Blank Page...
Page 51: ...Section Rev February 2009 Section 1 Operations 1 17 Figure 1 14 Setting New Pins...
Page 94: ...3 2 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Page 131: ...Section Rev February 2017 Section 3 Nexgen Electronics 3 39 Intentionally Blank...
Page 134: ...3 42 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Page 136: ...3 44 Section 3 Nexgen Electronics Section Rev February 2017 Back of 11 x 17 Here...
Page 150: ...3 58 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Page 152: ...4 2 Section 4 Pinsetter Cycles Section Rev February 2009 Intentionally Blank Page...
Page 158: ...4 8 Section 4 Pinsetter Cycles Section Rev February 2009 Figure 4 5 Pinsetter Cycles...
Page 176: ...5 2 Section 5 Adjustments Section Rev February 2017 Intentionally Blank Page...
Page 226: ...6 2 Section 6 Troubleshooting Section Rev February 2009 Intentionally Blank Page...
Page 246: ...6 22 Section 6 Troubleshooting Section Rev February 2009 Intentionally Blank...
Page 257: ...Section Rev February 2009 Section 7 Preventative Maintenance 7 11...
Page 284: ...7 38 Section 7 Preventative Maintenance Section Rev February 2009...
Page 286: ...8 2 Section 8 Servicing Section Rev February 2009 Intentionally Blank Page...