Section Rev. February 2009
Section 8: Servicing
8-11
SPOTTING TONG CLUTCH AND SHAFT REMOVAL PROCEDURE
NOTE:
Disconnect incoming power to the Nexgen Controller before proceeding with the
removal of the spotting tong clutch and shaft.
1. Remove the Torx screws which hold the switch cluster assembly to the pinsetter frame. Refer to
Figure 8-9.
Figure 8-9. Remove Hardware.
(1) CLUTCH SHAFT GEAR
(2) TORX SCREWS
(3) SWITCH CLUSTER ASSEMBLY
2. Disconnect the wires from the “A”, “B”, “C”, and “D” switches. Molex connection can be
found in the wire channel above the cluster.
3. Remove the upper section of the spotting tong square shaft.
4. Slide the shaft out and cluster assembly towards the back of the pinsetter and lift it out of the
spotting tong solenoid and remove it from the pinsetter.
5. Disassemble the clutch assembly by compressing the clutch spring with the spring tightener
and rotating the spring tightener to the open slot. By doing so, the clutch assembly can be
disassembled.
Summary of Contents for GS-X Series
Page 1: ...Operations Service Manual GS X Pinsetter with Advanced CE Guarding March 2017 47 902748 000...
Page 4: ...2 Safety Section Section Rev February 2017 Intentionally Blank Page...
Page 15: ...Section Rev February 2017 Safety Section 13 GS Safetty Mirror Safety Mirror...
Page 36: ...1 2 Section 1 Operations Section Rev February 2009 Intentionally Blank Page...
Page 51: ...Section Rev February 2009 Section 1 Operations 1 17 Figure 1 14 Setting New Pins...
Page 94: ...3 2 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Page 131: ...Section Rev February 2017 Section 3 Nexgen Electronics 3 39 Intentionally Blank...
Page 134: ...3 42 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Page 136: ...3 44 Section 3 Nexgen Electronics Section Rev February 2017 Back of 11 x 17 Here...
Page 150: ...3 58 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Page 152: ...4 2 Section 4 Pinsetter Cycles Section Rev February 2009 Intentionally Blank Page...
Page 158: ...4 8 Section 4 Pinsetter Cycles Section Rev February 2009 Figure 4 5 Pinsetter Cycles...
Page 176: ...5 2 Section 5 Adjustments Section Rev February 2017 Intentionally Blank Page...
Page 226: ...6 2 Section 6 Troubleshooting Section Rev February 2009 Intentionally Blank Page...
Page 246: ...6 22 Section 6 Troubleshooting Section Rev February 2009 Intentionally Blank...
Page 257: ...Section Rev February 2009 Section 7 Preventative Maintenance 7 11...
Page 284: ...7 38 Section 7 Preventative Maintenance Section Rev February 2009...
Page 286: ...8 2 Section 8 Servicing Section Rev February 2009 Intentionally Blank Page...