
Section Rev. February 2017
Safety Section
19
WORK AREAS
The operation, maintenance and repair of the GS pinsetter can be accomplished using five defined work
areas or locations. Refer to figure titled
Work Areas
. As defined from the most to least frequently used,
the areas include:
Area 1 - Floor
Area 2 - Ball accelerator platform
Area 3 - Standing platforms between or at the front of the pinsetter
Area 4 - On the pindeck
Area 5 - On top of the distributor
CAUTION: When accessing the machine for work areas 3 -5, the main power
switch on the Nexgen or Safety Controller must be locked into the off position
using a suitable locking mechanism.
(1)
WORK
AREA 1
(2)
WORK AREA 2
(3)
WORK AREA 3
(4)
WORK
AREA 4
(5)
WORK
AREA 5
(5)
WORK
AREA 5
Working Areas
(1) WORK AREA 1
(2) WORK AREA 2
(3) WORK AREA 3
(4) WORK AREA 4
(5) WORK AREA 5
Summary of Contents for GS-X Series
Page 1: ...Operations Service Manual GS X Pinsetter with Advanced CE Guarding March 2017 47 902748 000...
Page 4: ...2 Safety Section Section Rev February 2017 Intentionally Blank Page...
Page 15: ...Section Rev February 2017 Safety Section 13 GS Safetty Mirror Safety Mirror...
Page 36: ...1 2 Section 1 Operations Section Rev February 2009 Intentionally Blank Page...
Page 51: ...Section Rev February 2009 Section 1 Operations 1 17 Figure 1 14 Setting New Pins...
Page 94: ...3 2 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Page 131: ...Section Rev February 2017 Section 3 Nexgen Electronics 3 39 Intentionally Blank...
Page 134: ...3 42 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Page 136: ...3 44 Section 3 Nexgen Electronics Section Rev February 2017 Back of 11 x 17 Here...
Page 150: ...3 58 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Page 152: ...4 2 Section 4 Pinsetter Cycles Section Rev February 2009 Intentionally Blank Page...
Page 158: ...4 8 Section 4 Pinsetter Cycles Section Rev February 2009 Figure 4 5 Pinsetter Cycles...
Page 176: ...5 2 Section 5 Adjustments Section Rev February 2017 Intentionally Blank Page...
Page 226: ...6 2 Section 6 Troubleshooting Section Rev February 2009 Intentionally Blank Page...
Page 246: ...6 22 Section 6 Troubleshooting Section Rev February 2009 Intentionally Blank...
Page 257: ...Section Rev February 2009 Section 7 Preventative Maintenance 7 11...
Page 284: ...7 38 Section 7 Preventative Maintenance Section Rev February 2009...
Page 286: ...8 2 Section 8 Servicing Section Rev February 2009 Intentionally Blank Page...