5-6
Section 5: Adjustments
Section Rev. February 2017
2. Cycle the pinsetter and observe any side movement of the band on the rear roller. (Using
Diagnostics will load the band with ten pins to help in determining if the tension is proper.)
3. If the band is moving to the left, tighten the inside jam nut on the left side 1/2 turn and loosen
the inside jam nut on the right side 1/2 turn. Refer to
Figure 5-3.
If the band is moving to the
right, tighten the inside jam nut on the 1/2 turn and loosen the inside jam nut on the left 1/2
turn.
(1)
THREADED BOLT
FOR TENSIONING
(2)
BEARING JAM NUT
(3)
INSIDE JAM NUT
(4)
OUTSIDE JAM NUT
Figure 5-4. Jam Nut for Tensioning the Transport Band.
(1) THREADED BOLT FOR
(2) BEARING JAM NUT
(3)
INSIDE JAM NUT
TENSIONING
(4) OUTSIDE JAM NUT
4. After each adjustment observe the movement of the transport band. The transport band may
move sideways very slowly so allow the pinsetter to run at least 3 - 4 minutes to see any
reaction to the change in tension. Repeat step “c” as required until the band is centered and has
stopped its sideways movement.
5. Lock the outside jam nut against the inside jam nut to keep the transport band tracking properly
on the rollers.
i
NOTE:
Always remember to tighten the outside jam and bearing jam nuts.
Summary of Contents for GS-X Series
Page 1: ...Operations Service Manual GS X Pinsetter with Advanced CE Guarding March 2017 47 902748 000...
Page 4: ...2 Safety Section Section Rev February 2017 Intentionally Blank Page...
Page 15: ...Section Rev February 2017 Safety Section 13 GS Safetty Mirror Safety Mirror...
Page 36: ...1 2 Section 1 Operations Section Rev February 2009 Intentionally Blank Page...
Page 51: ...Section Rev February 2009 Section 1 Operations 1 17 Figure 1 14 Setting New Pins...
Page 94: ...3 2 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Page 131: ...Section Rev February 2017 Section 3 Nexgen Electronics 3 39 Intentionally Blank...
Page 134: ...3 42 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Page 136: ...3 44 Section 3 Nexgen Electronics Section Rev February 2017 Back of 11 x 17 Here...
Page 150: ...3 58 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Page 152: ...4 2 Section 4 Pinsetter Cycles Section Rev February 2009 Intentionally Blank Page...
Page 158: ...4 8 Section 4 Pinsetter Cycles Section Rev February 2009 Figure 4 5 Pinsetter Cycles...
Page 176: ...5 2 Section 5 Adjustments Section Rev February 2017 Intentionally Blank Page...
Page 226: ...6 2 Section 6 Troubleshooting Section Rev February 2009 Intentionally Blank Page...
Page 246: ...6 22 Section 6 Troubleshooting Section Rev February 2009 Intentionally Blank...
Page 257: ...Section Rev February 2009 Section 7 Preventative Maintenance 7 11...
Page 284: ...7 38 Section 7 Preventative Maintenance Section Rev February 2009...
Page 286: ...8 2 Section 8 Servicing Section Rev February 2009 Intentionally Blank Page...