5-16
Section 5: Adjustments
Section Rev. February 2017
ELEVATOR SHOVEL CAM ADJUSTMENT
i
NOTE:
Prior to making this adjustment, make sure the shark assembly is level and positioned
135 mm from the back plate of the elevator.
1. Manually position the elevator’s pin shovels so the lower surface of the pin shovel is 22 mm + 2
mm above the top surface of the pin turn wedges. Refer to
Figure 5-17.
(7)
SHOVEL CAM
(3)
LOWER SHOVEL
END
(2)
CENTER LINE
ON SHOVEL CAM
(4)
PIN TURN
WEDGE
(5)
WOOD
TEMPLATE
22 mm 2 mm
+
-
(1)
ATTACHING
HARDWARE
(6)
PIN SHOVEL GUIDE
ROLLER
Figure 5-17. Elevator Pin Shovel Cam Adjustment.
(1) ATTACHING HARDWARE
(2) CENTER LINE ON SHOVEL CAM (3) LOWER SHOVEL END
(4) PIN TURN WEDGE
(5) WOOD TEMPLATE
(6) PIN SHOVEL GUIDE ROLLER
(7) SHOVEL CAM
2. Loosen the attaching hardware and position the shovel cam so that the pin shovel’s guide roller
is at the mid point of the cam.
3. Tighten the attaching hardware and check for proper operation.
Summary of Contents for GS-X Series
Page 1: ...Operations Service Manual GS X Pinsetter with Advanced CE Guarding March 2017 47 902748 000...
Page 4: ...2 Safety Section Section Rev February 2017 Intentionally Blank Page...
Page 15: ...Section Rev February 2017 Safety Section 13 GS Safetty Mirror Safety Mirror...
Page 36: ...1 2 Section 1 Operations Section Rev February 2009 Intentionally Blank Page...
Page 51: ...Section Rev February 2009 Section 1 Operations 1 17 Figure 1 14 Setting New Pins...
Page 94: ...3 2 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Page 131: ...Section Rev February 2017 Section 3 Nexgen Electronics 3 39 Intentionally Blank...
Page 134: ...3 42 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Page 136: ...3 44 Section 3 Nexgen Electronics Section Rev February 2017 Back of 11 x 17 Here...
Page 150: ...3 58 Section 3 Nexgen Electronics Section Rev February 2017 Intentionally Blank Page...
Page 152: ...4 2 Section 4 Pinsetter Cycles Section Rev February 2009 Intentionally Blank Page...
Page 158: ...4 8 Section 4 Pinsetter Cycles Section Rev February 2009 Figure 4 5 Pinsetter Cycles...
Page 176: ...5 2 Section 5 Adjustments Section Rev February 2017 Intentionally Blank Page...
Page 226: ...6 2 Section 6 Troubleshooting Section Rev February 2009 Intentionally Blank Page...
Page 246: ...6 22 Section 6 Troubleshooting Section Rev February 2009 Intentionally Blank...
Page 257: ...Section Rev February 2009 Section 7 Preventative Maintenance 7 11...
Page 284: ...7 38 Section 7 Preventative Maintenance Section Rev February 2009...
Page 286: ...8 2 Section 8 Servicing Section Rev February 2009 Intentionally Blank Page...