Tu c k t h e n e w
Weighing Platform
cable into the component
cavity.
D i s c o n n e c t t h e
Weighing Platform
cable from the port of the
IS-240/280 mailing system.
Remove the Weighing
Platform cable from
the component cavity.
Disconnect the power
cable from the wall
outlet. This will turn off the
IS-240/280 mailing system.
IS-240/280 Series
Weighing Platform Replacement Guide
Weighing Platform Components
1 - Weighing Platform
1 - Prepaid Shipping Label
Put the mail machine in
sleep mode by pressing
the sleep wake button .
For more information or if you experience any issues please visit :
kb.quadient.us/IS280
The following steps will guide you through the removal of the weighing platform and installation of a
new weighing platform.
Weighing
Platform
Place the old Weighing Platform into the new
shipping package. Seal the package with
packing tape (not provided). Apply the prepaid
label to the package over the old shipping label.
Connect the new
Weighing Platform
cable to the port of the IS-
240/280 mailing system.
Shipping Package Contents
Remove the new
Weighing Platform
and shipping label from
the shipping package.
IS-240/280
Mailing
System
(back view)
Replacing The Weighing Platform
2
3
1
4
5
7
8
6
The power indicator light will
be amber.