46
13. Connect the ESU-2400 to the DUT. Connect the Yellow cable from the Active port
on the ESU-2400 to active output on the DUT. Connect the Blue cable from the
Dispersive ports of the ESU-2400 to the return on the DUT.
14. Press Save Configuration on the ESU-2400 to save the Load Curve settings to a
file for future use, or Press Start Load Curve to begin the test. You will be prompted
when to start and stop triggering the generator.
Summary of Contents for ESU-2400
Page 1: ...ELECTROSURGICAL UNIT ANALYZER ESU 2400 Series USER MANUAL...
Page 2: ......
Page 9: ...vii...
Page 44: ...32 5 Trigger the DUT The ESU 2400 will show the mA RMS measurement in the display...
Page 46: ...34 5 Trigger the DUT The ESU 2400 will show the mA RMS measurement in the display...
Page 48: ...36 6 Trigger the DUT The ESU 2400 will show the mA RMS measurement in the display...
Page 50: ...38 6 Trigger the DUT The ESU 2400 will show the mA RMS measurement in the display...
Page 177: ...165 This Page Intentionally Left Blank...
Page 186: ...174 NOTES...
Page 187: ...175 NOTES...
Page 188: ...176 NOTES...
Page 189: ......