52
Auto CQM
– I need to test the CQM input on my generator. My generator service manual
says to increase the CQM resistance starting at 120 ohms until the CQM alarm occurs.
The CQM trip resistance should be 135 ohms +/- 5 ohms.
Solution
–
1. From the Autosequence menu, select Add Step.
2. Select the desired location for the new step and press OK.
3. The new step will always default to an instruction type step. Select the
REM/ARM/CQM option button near the bottom of the screen.
4. Press the Title text box to change the step title as desired. You will need to use
an external keyboard for this.
5. Press the Instructions to Operator text box to enter any instructions that the user
might need to perform at this step of the autosequence.
6. Press the Meter Setup button to configure the settings for the REM test.
7. Select the Auto CQM option at the top of the screen.
Summary of Contents for ESU-2400
Page 1: ...ELECTROSURGICAL UNIT ANALYZER ESU 2400 Series USER MANUAL...
Page 2: ......
Page 9: ...vii...
Page 44: ...32 5 Trigger the DUT The ESU 2400 will show the mA RMS measurement in the display...
Page 46: ...34 5 Trigger the DUT The ESU 2400 will show the mA RMS measurement in the display...
Page 48: ...36 6 Trigger the DUT The ESU 2400 will show the mA RMS measurement in the display...
Page 50: ...38 6 Trigger the DUT The ESU 2400 will show the mA RMS measurement in the display...
Page 177: ...165 This Page Intentionally Left Blank...
Page 186: ...174 NOTES...
Page 187: ...175 NOTES...
Page 188: ...176 NOTES...
Page 189: ......