
■
Sample standard panel schedule
Typically, you would add a panel schedule to a panel schedule sheet that does not contain any panels. But
for a smaller project you might add a panel schedule to a drawing that contains one or more panels. You
can customize a schedule to define the panel, circuit, wire, and load data that it contains, and how it is
organized.
Generating Panel Schedules
You can generate panel schedules for a single drawing, or for circuits that span multiple drawings. Once
generated, you can continue to add devices to circuits, or even new circuits and panels.
When you make changes to your drawings that affect the information in a panel schedule, the panel schedule
will need updating. Such changes include:
■
Adding and deleting circuits
■
Deleting a panel
■
Linking or unlinking panels
■
Attaching or detaching devices to/from a circuit
■
Changing the number of load categories used by the panel
■
Changing the phase load of a device
■
Changing circuit properties, such as rating or description
■
Changing panel properties, such as panel name, rating, or wires
About Panel Schedules | 455
Summary of Contents for 235B1-05A761-1301 - AutoCAD MEP 2010
Page 1: ...AutoCAD MEP 2010 User s Guide March 2009 ...
Page 22: ...4 ...
Page 86: ...68 ...
Page 146: ...128 ...
Page 180: ...162 ...
Page 242: ...Modifying the elevation of a duct 224 Chapter 6 Drawing HVAC Systems ...
Page 264: ...246 ...
Page 480: ...462 ...
Page 534: ...516 ...
Page 616: ...598 ...
Page 658: ...640 ...
Page 788: ...770 ...
Page 802: ...784 ...
Page 820: ...802 ...
Page 878: ...860 ...