Rev D
CHP Max5000 Chassis (Front Fiber Version)
3-9
Local and Remote Monitoring
The CHP Max SMM (SNMP agent) enables monitoring and management of CHP Max
equipment by communicating with an SNMP element manager with an appropriate
configuration of IP addresses and management information bases (MIBs).
Management signals enter the SMM module through the
Ethernet
SNMP port. The SMM
directs the management signals to a module in its own chassis or to another connected
chassis. The CMM module in that chassis directs the signals to the appropriate application
module. Signals from the module travel back through the SPI, to the CMM, through the daisy
chain to the SMM, which communicates with the remote management system. One SMM
may be used to permit remote management of up to an additional nine chassis with a CMM
installed in each.
Handle Kit Installation
The front handles of the CHP-CHASSIS-R-19 are not installed on the chassis but are packed
with this chassis as a handle kit (P/N CHP-HANDLE-KIT). This kit includes two handles and
four Phillips screws. If you wish to install front handles to the chassis, they must be installed
before the chassis is installed into the rack. Do not install front handles to the chassis if you
plan to mount a 2RU tablet PC bracket assembly (P/N 1500376-001) to the chassis.
➤
To install the handle kit (P/N CHP-HANDLE-KIT)
1. Position a new handle (P/N 862551) with the longer section of the handle at the
bottom and align the two mounting holes with the smaller mounting holes on the
front flange of the chassis. Refer to Figure 3.1 on page 3-2.
2. Install two Phillips screws (P/N 300014-0506) and tighten using a #2 Phillips
screwdriver.
3. Repeat Steps 1 and 2 to install the other handle.
Tablet PC Installation Requirements
The 2RU tablet PC bracket assembly (P/N 1500376-001) is installed in a standard 19-inch rack
to hold a tablet PC that can interface with the DB9 female
Craft Interface
connector on either
the front of the CMM or SMM module. This bracket can either be installed in front of a
CHP-CHASSIS-R-19 or CHP-CHASSIS-R-19Q chassis without the handle kit (P/N
CHP-HANDLE-KIT) installed or any place in the rack with 2RU (3.5 inches) of free space. The
bracket is designed to only hold an HP-Compaq tablet PC model TC1100 and this tablet PC
should have the following peripherals:
■
CD-ROM drive capability to load the CMM software and firmware files
■
USB serial cable (P/N CHP-RS232-USB) for communications between the tablet PC
(type A male) and CMM/SMM (DB9 male).
Refer to the paragraph
to install the tablet PC bracket assembly.
Note
Do not install front handles to the chassis if you plan to mount a 2RU tablet
PC bracket assembly (P/N 1500376-001) to the front of the chassis.
Summary of Contents for CHP Max5000
Page 2: ......
Page 12: ...x CHP Max Headend Optics Platform Chassis Controllers and Power Supplies 1508685 Rev D...
Page 100: ...4 18 CHP Max Headend Optics Platform Chassis Controllers and Power Supplies Rev D...
Page 120: ...5 20 CHP Max Headend Optics Platform Chassis Controllers and Power Supplies Rev D...
Page 199: ...Rev D System Management Module 2 SMM 2 7 33 Figure 7 28 Add CHPMax5000 Device Window...
Page 261: ...1508685 Rev D CHP Max Trap Information B 29...
Page 262: ...B 30 CHP Max Headend Optics Platform Chassis Controllers and Power Supplies 1508685 Rev D...
Page 266: ......