7-8
CHP Max™ Headend Optics Platform Chassis, Controllers and Power Supplies
Rev D
CLI is also available via a Telnet session.
Equipment Description
Figure 7.2
CHP Max System
Management
Module 2 (SMM-2)
The CHP Max SMM-2 allows you to set up, monitor, and control the CHP Max application
modules, power supply/supplies, and fan module(s). The SMM-2 plugs into the CHP Max
chassis, auto-discovers installed application modules, and monitors those modules. Front
panel LEDs indicate whether power supply, fan, and application modules are operating
within user-set limits.
The SMM-2 polls modules co-located in that management module's chassis and
daisy-chained chassis for operating parameters and all modules for internal temperature
and DC voltage alarms at fixed time intervals, reporting that information back to the user.
Note
SMM-2 firmware upgrades of application modules may be service-affecting
under certain circumstances, so ARRIS strongly recommends performing upgrades
in a service maintenance window.
Summary of Contents for CHP Max5000
Page 2: ......
Page 12: ...x CHP Max Headend Optics Platform Chassis Controllers and Power Supplies 1508685 Rev D...
Page 100: ...4 18 CHP Max Headend Optics Platform Chassis Controllers and Power Supplies Rev D...
Page 120: ...5 20 CHP Max Headend Optics Platform Chassis Controllers and Power Supplies Rev D...
Page 199: ...Rev D System Management Module 2 SMM 2 7 33 Figure 7 28 Add CHPMax5000 Device Window...
Page 261: ...1508685 Rev D CHP Max Trap Information B 29...
Page 262: ...B 30 CHP Max Headend Optics Platform Chassis Controllers and Power Supplies 1508685 Rev D...
Page 266: ......