Copyright by Servizio Clienti ANGELO PO Spa
69
4.7. Installation report
When first installed, the installer must fill in all parts of the following installation report and
send it to "Angelo Po" within 7 days for the activation of the Warranty.
It presents data connection, and in particular must show the power supply, if possible, the
mains water pressure (and other available data, e.g. Water hardness or presence of water
treatment system) and the type of vent (if directly under a hood or connection).
The type of gas and the combustion gas analysis must be indicated.
Place here a magnet during
the gas flue analysis
Summary of Contents for FX Series
Page 1: ...Copyright by Servizio Clienti ANGELO PO Spa 1 Rev 1 LEVEL 1 and 2 LEVEL 3 LEVEL 2 ...
Page 4: ...Copyright by Servizio Clienti ANGELO PO Spa 4 1 COMMERCIAL MODEL NUMBER 2 3 ...
Page 8: ...Copyright by Servizio Clienti ANGELO PO Spa 8 OVEN CONNECTION DIAGRAM FX122G3 ...
Page 34: ...Copyright by Servizio Clienti ANGELO PO Spa 34 1a CPU board 1b Keyboard ...
Page 46: ...Copyright by Servizio Clienti ANGELO PO Spa 46 Functional diagram gas system ...
Page 106: ...Copyright by Servizio Clienti ANGELO PO Spa 106 PICTURE 7 PICTURE 8 PICTURE 5 PICTURE 6 ...
Page 117: ...Copyright by Servizio Clienti ANGELO PO Spa 117 7 16 Roll In adjustment RX201 RX202 ...
Page 118: ...Copyright by Servizio Clienti ANGELO PO Spa 118 ...