![Amada MD-A8000B-05 Series Operation Manual Download Page 29](http://html1.mh-extra.com/html/amada/md-a8000b-05-series/md-a8000b-05-series_operation-manual_2915803029.webp)
MD Series
5. Connection
5-9
2
On the schedule-select and start signals (Common to MD series)
●
Selection of welding schedule
*1: The welding schedule is decided after the start signal is input and the time set
for START SIG.TIME on the STATUS screen goes by.
In the example above, schedule select 1, 4, 8 and 16, and parity are turned ON,
and welding is performed with the schedule No. 29.
●
Time duration from start signal input to weld force start
*1: Time duration from schedule or start input to weld force start: Changes
depending on the setting of START SIG.TIME on the STATUS screen. The
following time is required; 1 ms for 1-ms setting, 5 ms for 5-ms setting, 10 ms for
10-ms setting, and 20 ms for 20-ms setting.
(2ND STAGE)
(SOL)
*1
HD
WE
DS
UP
SQ
Start input
Weld force output
Welding current
(PARITY)
(SCH 16)
(SCH 8)
(SCH 4)
(SCH 2)
(SCH 1)
(1ST STAGE,2ND STAGE)
Schedule select input
Schedule select input
Schedule select input
Schedule select input
Schedule select input
Parity input
Start input
*1
Summary of Contents for MD-A8000B-05 Series
Page 95: ......